Sustainability
Partners in Sustainability
Sustainability is engrained within Revive’s business model by applying the principles of the waste hierarchy: Reduce, Reuse, and Recycle.
Energy-saving methods and practices are a core element in the way we work and the equipment we manufacture.
Revive Park
Ireland’s first off-grid facility, located within the Lisheen National Bioeconomy Campus, powered by wind and solar energy this site has been purpose-built by Revive.
Mid-Tipperary Decarbonising Zone
Ireland’s first rural zone aims to achieve net-zero emissions through community collaboration and renewable energy sources.
National Bioeconomy Campus at Lisheen
Nestled within the Mid-Tipperary DZ this site leads bio-based innovation, transforming renewable resources into a sustainable future.
Built-to-Last
The Revive Life Cycle is designed to maximise longevity and durability, reducing the requirement for additional steel consumption.
Revive Program
By reducing the demand for virgin steel our Revived units save up to 25-tonnes of CO2 from being produced.
Cleaner, Quieter & Safer
Revive units are remounted onto a brand new chassis ensuring the latest technology and guaranteeing efficiency.
Revive Park
Revive Park will provide a sustainable off-grid manufacturing facility for our products. Located at the centre-point of the Mid-Tipperary Decarbonising Zone, within the Lisheen National Bioeconomy Campus, powered by wind and solar energy this site has been purpose-built by Revive. The park will feature six purpose-built manufacturing sites to host a community of like-minded businesses and organisations.
With the first unit scheduled to be fully operational in late 2024; Revive Park will act as a catalyst for local job creation, showcasing the region as a prominent exporter of Irish products to a global audience.
Utilising the power of Ireland’s largest inland wind farm and with the development of a new solar farm on-site; Revive Park will stand as a testament to our unwavering commitment towards environmental responsibility and sustainability.
Delivering complete energy independence, when completed the park’s six sites are designed to operate entirely off-grid.
Join us in redefining the future of business – where innovation meets responsibility.
Building One - Our new manufacturing facility
Set to be fully operational in 2024, Revive’s new off-grid manufacturing facility is designed to be the focal point of Revive Park and home of the Revive Warrior.
Building One is just the beginning – we’re planning six units in total, all built with a net zero energy input requirement delivered through solar and wind gain.
Each unit is available for rent to manufacturing companies that share our commitment to a greener future for Ireland.
If you’re interested in joining us at The Home of Sustainability – get in touch.
Our Team
We remanufacture, manufacture and develop specialised mobile-environmental equipment for the water and wastewater industry.
View our careers